ROY HILL – Project Completion

A construction site with various pipes and equipment, showcasing the use of piping solutions.

Client: Roy Hill
Services: Project Completion
Project: Mainline 2 Extension & In Pit Saline Connector

Scope:

  • Clear and grub pipe alignment
  • 300m of DN800 PN10 HDPE Pipeline & associated fittings
  • 100m of DN250 PN10 HDPE Pipeline & associated fittings
  • 3000m of DN360 PN10 HDPE Pipeline & associated fittings
  • Supply & installation of all valves
  • Add in four connections to existing pipeline
  • Pipeline burials for seven track/road crossings
  • Installation of flow meter, Telemetry panel and cabling
Key Equipment:

  • Earth Moving Equipment:
    • 24t Excavator
    • Loader
    • Skid Steers
  • Heavy Vehicles:
    • Various Light Vehicles
    • Water Cart
    • Canter Crew Truck
  • Welding Equipment:
    • McElroy T900 Welders
    • Dixon HF630 Welder
    • Dixon HF355 Welder
  • Ancillary Equipment:
    • Genset – General 6KVA
    • Genset – Site Office 22KVA
    • Genset – 12KVA

Related Projects

Fortescue's new pipeline linking to Port Augusta port, featured on a civil construction blog.

Rio Tinto – Yandicoogina

Client: Rio Tinto Services: Yandicoogina Project: Oxbow Scope: Design management, supply and install 8 x bore dewatering headworks trailers Supply and install...

READ MORE
Fortescue's new infrastructure pipeline linking to Port Augusta port.

FMG – Cloudbreak

Client: FMG Cloudbreak Project: Lefthander Conveyance Main Scope: Clear and grub 8.5 hectares for pipe corridor, access track and fire break Installation of HD...

READ MORE
A speech bubble with a message on it, utilizing keyword piping solutions for effective communication.