FMG – Cloudbreak

A worker stands beside a massive pipe on a dirt road, overseeing civil engineering projects.

Client: FMG Cloudbreak
Project: Saline Injection Zone i

Scope:

  • Installation of 15 Injection bore units
  • Installation of temporary fencing around bores
  • Installation and poly welding of HDPE pipeline, comprising:
    • 10,560m of DN630 PN6.3 HDPE PE 100
    • 760m of DN250 PN6.3 HDPE PE 100
Key Equipment:

  • Earth Moving Equipment:
    • 40t Moxy Dump Truck
    • D8 Bulldozer
    • 24t Excavator
    • 33t Excavator
    • L90 Loader
    • Z80 Loader
    • Z70 Loader
    • 12m Grader
    • Skid Steers
  • Heavy Vehicles:
    • Various Light Vehicles
    • 6×4 Tippers
    • Service Trucks
    • Water Carts
    • 20t Franna
    • Canter Crew Truck
  • Welding Equipment:
    • McElroy T900 Welders
    • Veitz VFT900 Welder
  • Ancillary Equipment:
    • Office Blocks
    • Crib Rooms
    • Toilet Blocks
    • Water Tanks
    • Genset – General 6KVA
    • Genset – Dixon 12.5KVA
    • Genset – Back up 13KVA

Related Installation

Rotoito constructing new mine in Australia with innovative piping solutions.

Rio Tinto – West Angelas

Client: RTIO - West Angelas Project: AEF Pipe and Pump Install Scope: Installation, Testing & Commissioning of 9,588m of DN355 PN20 & associated fittings ...

READ MORE
A speech bubble with a message on it, utilizing keyword piping solutions for effective communication.