Client: FMG Cloudbreak
Project: Lefthander Conveyance Main
Scope:
- Clear and grub 8.5 hectares for pipe corridor, access track and fire break
- Installation of HDPE pipeline consisting of 4,200m of DN630 HDPE pipe
- Installation of 20 pipe burials
- Construction of 4 Flushing Bunds
- Flushing, hydrostatic testing and commissioning of piping infrastructure
Key Equipment:
- Earth Moving Equipment:
- 40t Moxy Dump Truck
- D8 Bulldozer
- 24t Excavator
- 33t Excavator
- L90 Loader
- Z80 Loader
- Z70 Loader
- 12m Grader
- Skid Steers
- Heavy Vehicles:
- Various Light Vehicles
- 6×4 Tippers
- Service Trucks
- Water Carts
- 20t Franna
- Canter Crew Truck
- Welding Equipment:
- McElroy T900 Welders
- Veitz VFT900 Welder
- Ancillary Equipment:
- Office Blocks
- Crib Rooms
- Toilet Blocks
- Water Tanks
- Genset – General 6KVA
- Genset – Dixon 12.5KVA
- Genset – Back up 13KVA